RECENT PROJECTS

Project Description:

Our Role:

Project Time Span:

What did we do:

Outcomes:

GDPR Implementation

Project Lead

Feb 2018 – June 2018

Implemented a comprehensive GDPR readiness program to ensure compliance.  This included:

  • GDPR Awareness campaigns encompassing screensavers, payroll leaflets, intranet and extranet content, infographics, a full eLearning module, staff quizzes and awareness sessions.
  • The Trust’s policies, procedures, job terms and conditions and vendor agreements have been collated and updated and mapped to a 200 line, GDPR (Article specific) compliance checklist.
  • Review of information incident management procedures.
  • Roles within the Trust have been reviewed to ensure that the DPO role is assigned.
  • The Trust’s Privacy Impact Assessment template was revised to form a new Data Protection Impact Assessment template and work started on key systems to ensure its completion.
  • All The Trust’s websites have been audited and privacy statements updated.
  • Comprehensive GDPR questionnaire sent to key system suppliers.
  • Compliance with GDPR in place by May 25th 2018
  • Awareness of GDPR raised
  • Trust websites audited and updated
  • Information leaflets and screensavers distributed
  • Awareness sessions in place

Project Description:

Our Role:

Project Time Span:

What did we do:

Outcomes:

Theatres and Critical Care Facility Outline Business Case (OBC)

Preparation of NHSI compliant Outline Business Case

Oct 2016 – March 2018

The Trust had engaged a supplier through the P21+ Framework and required a business case advisor/author to prepare a Treasury 5-case model OBC for submission through Trust approvals and then to NHSI to support their capital bid for the build. We provided a compliant template and through various workshops and meetings, populated the template building on work previously completed on their Strategic Outline Case (SOC). We then performed a gap analysis based on the NHSI checklist and engaged with all key stakeholders to generate content. Support continued through several variations of the build proposal and a compliant OBC was produced and signed off by the Trust’s project lead.

NHSI compliant OBC presented to the Trust for approvals

Project Description:

Our Role:

Project Time Span:

What did we do:

Outcomes:

Take a new medical device through CE certification

Programme Manager

Dec 2017 – March 2019

Provide project initiation and ongoing programme management to Xim to take their new software and hardware product through CE certification as a class II medical device.

This included:

  • Launching the project with formal initiation, PID, plan, workstream definitions and project board formation.
  • Programme Manager on an ongoing basis collating workstream checkpoint reports and producing project highlight reports.
  • Attend Project Board and support with appropriate documentation.
  • Ensure programme runs to time and budget
  • Produce the quarterly report to the SBRI who have funded the project
  • Attend commercialisation committee meetings
  • Attend SBRI review meetings

In progress but currently on track to produce CE certification by early 2019.

Project Description:

Our Role:

Project Time Span:

What did we do:

Outcomes:

Electronic Patient Record Procurement

Business Case; Specification and Procurement Lead

2016 – 2018

In this project we worked from the inception of the project to produce a business case for the introduction of an Electronic Patient Record system.  After gaining full approval to proceed from the Trust Board we specified all the business, technical and user requirements for the solution.  We then prepared for procurement launch including all necessary documents e.g. Invitation to Tender; Evaluation Model; Offer Schedule; Memorandum of Information.  We then ran an Open OJEU procurement process, documented the outcome and updated to case to a Full Business Case (FBC).  The Trust Board subsequently approved the results of the procurement process and the FBC.  We are now concluding the contractual details with the Preferred Bidder and will be assisting the Trust with deployment as Programme Manager.

Preferred Bidder stage; now concluding contract.
Procurement completed

Project Description:

Our Role:

Project Time Span:

What did we do:

Outcomes:

Secure Children’s Home SystmOne Use and Reporting

Project Management, Configuration & Training

2017 – 2018

Having deployed SystmOne across three Secure Childrens homes in the previous year we were asked by NHS E to work with them to improve their use of the system. Subsequently we were asked to help them produce their HJIPS Key Performance Indicator reports. We are now working with the three homes in a collaborative manner to standardise their methods of working and create revised templates to gather the required data and improve the clinical recording in the homes.

We are also redesigning a large assessment template that the homes find very difficult to work with, breaking it down to a central landing page with the other sections linked from it. This enables the home to complete the assessment in a more representative way to how they work clinically rather than having to enter all the data at the same time.

Improved clinical recording and reporting within the homes.

Project Description:

Our Role:

Project Time Span:

What did we do:

Outcomes:

Transfer of N3 network to HSCN with agreed Service Level Agreement (SLA)

Project Management

2018

Negotiation with Council IT services covering each of the three Childrens homes covered by NHS England in the South West. Ensuring continuity of service to the homes to be able to access their clinical systems. Also formalising the relationship to provide a guaranteed level of service to the home in maintaining the network connection to the home

Continuity of secure NHS network connection and agreed SLA’s